Beta Theta Pi
Beta Theta Pi
Psi Chapter
Bethany College
Actives Page
History Page

Home
News
Beta Theta Pi Recruiting
Beta Theta Pi
Recruiting

 

Psi Chapter House Corporation
House Repair and Refurbish Schedule

April, 2005

Phase 1 – Essential Projects to Re-open the Chapter House

No.

Item Name

Scope of Work

Projected Cost / Reference Contractor

1

Room Doors

 

 

Alley Steel Door

Replace all damaged doors

Door hardware

Locksets  (Medico same as BC)

 

 

 

             Estimate $7,500.

2

General Painting

Dorm Rooms

Halls

Exterior Doors and Frames

Interior Door Frames

Chapter Room

Great Hall

Rest Rooms and Shower and Ceiling

Repair water damaged drywall

 

 

$7,500. 

Perfection Painting

3

Window Coverings

 

Library

Vertical Blinds on all windows (PVC)

 

Remove and install carpet

Remove and install new wall paper

 

$6,500

Jamison Carpets

4

Electrical Repairs

·      Inspect all wiring, breakers, receptacles, switches, fire alarm system and smoke detectors.

·      Replace all 10 dorm room ceiling lights with 2’ x 4’ florescent fixtures

·      Repair exterior pole lights

 

 

$5,500.

United Electric

         

5

Plumbing Repairs

Inspect all plumbing.  Upgrade shower room:  urinals, fixtures

 

          Estimate $2,000.

6

HVAC Unit Repair

·      New room units - 12 heat/ac units ($14,000 total).

·      Entry Heaters – 3 each
($1,350 total).

 

 

$15,350.

Johnson Boiler

 

 

 

 

 

 

 

Total:    $ 44,350.

Phase 2 – Less Critical Projects, can be delayed but are needed

No.

Item Name

Scope of Work

Projected Cost / Reference Contractor

1

Furniture

Dorm Room furniture

General Quarters furniture

(minor repairs and cleaning)

 

          Estimate $3,000.

2

Landscaping upgrade

·      Shrub beds revamped

·      Trees trimmed 

·      New and replacement shrubs as needed

 

 

 

 

         Estimate $5,000.

3

Boiler Heat Revamp

 

   

         Estimate $7,500.

4

Shower  HVAC

 

Replace baseboard heaters with ceiling unit.  Room ventilation.

 

         Estimate $3,500

5

Shower Room

Partitions to accommodate millennium students

         Estimate $2,000.

 

 

 

 

 

 

 

Total:       $21,000.

Phase 3 – Wish List Projects

No.

Item Name

Scope of Work

Projected Cost / Reference Contractor

1

Security camera

 

         Estimate $8,000.

2

House Decorating

·      Beta emblems

·      Pictures

 

 

         Estimate $3,000.

 

 

 

Total:            $11,000.

 

 

 

Grand total

                      $76,350.

 
Psi Chapter Diamond Association is a non-profit organization of Psi chapter alumni.
For problems or questions regarding this web site, please contact us.
Last updated: September 19, 2008